CONTRACT of EASEMENT and COUNTY COMPARISON

 

COPILOT: Here’s a polished Model Easement Rider draft you could hand to an attorney for review. I’ve structured it in numbered clauses, tightened the language, and added protections that reflect the concerns you raised. This is not legal advice, but a strong framework for negotiation.


Draft Easement Rider (Homeowner Protections)

This Rider is attached to and made part of the Easement Agreement (“Agreement”) between the County and the undersigned Homeowner (“Grantor”).

In the event of conflict, the provisions of this Rider shall control.


1. Scope of Easement

The Easement is limited to the construction, operation, inspection, repair, and maintenance of the flood protection wall (“Wall”) as designed and approved in the project plans dated [insert date]. No other structures or uses are authorized.

Construction of the Flood Wall will have an announced Start and End date spanning no more than X days. And will vary for each homeowner. Workers appearing on the levee beyond that period will be incur  compensation for the homeowner.


2. Future Modifications

Any future increase in the height or width of the Wall, or expansion of the Easement Area, shall require a new easement agreement and separate compensation. This Agreement does not authorize modifications beyond the current approved design.

OR

It is not fair that compensation should only cover immediate market value loss when that could be significantly higher in the future. So if the County still insists on a right to future increases of wall height then, at that time, further compensation should be $15,000(inflation adjusted) per foot increase in height.


3. Duration and Termination

This Easement shall be perpetual only for the purposes stated herein. If the Wall is abandoned, removed, or ceases to serve a flood protection function, the Easement shall terminate and all rights revert to the Grantor.


4. Access Rights

·       Maintenance activities shall be limited to those necessary to maintain the structural integrity of the Wall. Any aesthetic maintenance (e.g., painting, surface treatment) must be done in consultation with the Grantor.

·

5. Access Points


6. Uniformity of Wall Height

The County shall ensure that the Wall is constructed to a uniform lidar elevation throughout the levee system, so that no property is disproportionately burdened by erroneous, excess visible wall height.


7. Landscaping and Vegetation


8. Homeowner Access

Homeowner access to the water shall not be denied and shall remain a right in perpetuity, subject only to reasonable safety restrictions during construction or emergency operations.


9. Compensation and Damages

·       Grantor shall be compensated for any diminution in property value caused by the Easement (fair market value of the easement rights) ,

·       including but not limited to loss of landscaping, proximity to structure, access, or view (Severance Damages) .

·       In the event of damage to Grantor’s property outside the Easement Area, the County shall promptly restore or compensate (Cost to Cure) .

·       Benefit is community‑wide, not unique to this parcel; should not offset compensation.

·       Temporary Construction Easement compensation is $x per day for estimated usage of land for y days. --  (typically based on the rental value of the land for the duration of construction).


10. Indemnification and Insurance

The County shall indemnify, defend, and hold harmless the Grantor from any liability, claims, or damages arising out of the County’s use of the Easement. The County shall maintain liability insurance covering all activities within the Easement Area.


11. Dispute Resolution

Any disputes arising under this Rider shall first be submitted to mediation. If unresolved, either party may pursue arbitration or litigation in accordance with California law.


Grantor: ___________________________
Date: ___________________________


✅ This is structured, enforceable, and covers scope, future changes, access, vegetation, compensation, indemnity, and dispute resolution.

Here’s a side‑by‑side comparison table showing how a County’s standard easement language would likely read versus the strengthened protections in your proposed Homeowner Rider. This format makes it very clear where you’re adding safeguards and where the County may push back.


County vs. Homeowner Easement Clauses

Category

County’s Likely Draft

Homeowner’s Rider (Proposed)

1. Scope of Easement

“Grantor grants County a perpetual easement for construction, operation, inspection, repair, and maintenance of the levee wall.”

“Easement limited to construction, operation, inspection, repair, and maintenance of the Wall as designed in [Project Plans, dated ___]. No other structures or uses are authorized.”

2. Future Modifications

Silent, or broad language allowing “future improvements as necessary.”

“Any future increase in height/width or expansion requires a new easement agreement and separate compensation. Current agreement applies only to approved design.”

OR

If I were not to be dead and gone before any future increase in wall height – I would be more concerned about that possibility than anything. It is not fair that compensation should only cover immediate market value loss when that could be significantly higher in the future. So if the County still insists on carte blanche for future increase of wall height then, at that time, further compensation should be $15,000(inflation adjusted) per foot increase in height.

3. Duration

“Perpetual easement.”

“Perpetual only for stated purposes. If Wall is abandoned/removed, easement terminates and rights revert to Grantor.”

4. Access Rights

“County may enter property at any time for inspection, maintenance, or emergency.”

“County must give 3 business days’ written notice (email/text acceptable) before entry, except in emergencies. Routine inspection no more than once every 2 years.”

5. Access Points

“County may establish access points as needed.”

“Limit to [X] street access points. All fenced, gated, locked. Locations fixed and disclosed in writing. Future changes require written notice.”

6. Wall Height Uniformity

Silent.

“Wall shall be constructed to uniform lidar elevation throughout system so no property (whose levee is currently higher than average ) is disproportionately burdened by excess visible wall height.”

7. Landscaping & Vegetation

“County may clear vegetation within easement area.”

“Grantor may maintain vegetation (e.g., ice‑plant, grass ) if not interfering with Wall. Removal limited to [X feet] beyond footprint. 30 days’ notice for removal of cactus or other plants to allow relocation.”

8. Water Access

Silent, or “subject to safety restrictions.”

“Homeowner access to water shall not be denied and shall remain a right in perpetuity, subject only to reasonable safety restrictions during construction/emergency.”

9. Compensation

“Grantor compensated for fair market value of easement.”

“Grantor compensated for diminution in property value, including loss of landscaping, access, or view. County must restore or compensate for damage outside easement area.”

10. Indemnification & Insurance

Silent, or minimal liability language.

“County shall indemnify, defend, and hold harmless Grantor from liability arising from County’s use. County shall maintain liability insurance covering easement activities.”

11. Dispute Resolution

Silent, or “California courts have jurisdiction.”

“Disputes first submitted to mediation; if unresolved, arbitration or litigation under California law.”

🔑 How to Use This Table


Here is an AI Easement Compensation Calculation. Initially the width of access around the wall was given as 6 feet and changed to 10 feet . You can see how much money the County could save by making it 6 feet.

PROMPT: Compensation from a County creating an easement on my property. The Easement is access to a levee on my land that is to be increased in height with a wall that would protrude about 4 feet. The main drawback from the easement is loss of view of a river alongside. And its ugliness. The county wants to access it only once a year. When the value of the property is $1 million, what typically would be the "appraisers” compensation “value of the easement rights (not the whole property)"

the wall is 90 feet long along the entire side of the edge of the property. There would be a benefit to the property in reducing the likelihood of future overflow flooding ( climate change exacerbating) especially as the property is in a class A flood zone. The county wants to control 10 feet  3 feet on either side of the wall which amounts to 90x10 6 = 900 540 sqft .


 

Property & Easement Facts

·        Lot size: 90 × 90 ft = 8,100 sq ft

·        Easement area: 90 × 10  6 ft = 900  540 sq ft

·        % of lot affected: 900 540 ÷ 8,100 ≈ 11  6.7 %

·        Property value: $1,000,000

·        Special factor: Wall provides flood protection benefit (reduces risk in Class A flood zone).

Owner vs. County Easement Appraisal Comparison

Category

Owner’s Appraisal (Homeowner Emphasis)

County’s Appraisal (Agency Emphasis)

Easement Area %

540 900 sq ft ÷ 8,100 sq ft = 11 6.7% of lot → argues for proportional value loss (~$110,000 66,700).

Notes easement is only a narrow strip, not full use loss; argues impact is minimal (<1–2% of property value).

View Loss Impact

River view is a premium feature; wall blocks sightline → 2–5% diminution ($20K–$50K).

Wall is low profile; view partially retained; flood protection offsets view loss → 0–1% diminution ($0–$10K).

Aesthetic Impact

Wall is “ugly,” stigmatizes property, reduces marketability → adds 1–3% loss ($10K–$30K).

Aesthetic impact is subjective; buyers value safety more than appearance → no measurable loss.

Flood Protection Benefit

Benefit is community‑wide, not unique to this parcel; should not offset compensation.

Direct benefit: reduced flood risk in Class A zone → offsets damages by 1–2% ($10K–$20K).

Net Diminution %

11% 6.7% (area) + 2–5% (view) + 1–3% (aesthetic) = ~14-19   10–15%

total → $140K–$190K   $100K–$150K.

1–2% (minimal impact) – 1–2% (benefit offset) = ~0–1% net → $0–$10K.

Estimated Compensation

$140K–$190K

$0–$10K

⚖️ How This Plays Out

·        Owner’s strategy: Emphasize loss of view, aesthetics, stigma, and argue that flood protection is a general benefit (not deductible).

·        County’s strategy: Minimize view/aesthetic loss, highlight safety benefit, and argue the easement is a tiny fraction of the lot.

Likely settlement zone: Somewhere between — often $35K–$75K $20K–$50K  per property, depending on jury perception and expert testimony

I request that all of the following be provided IN WRITING:-

 

<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< 

some kind of limit to future increases to the height of TRB / Wall.

Say, for instance, in 2040 they think they should add another 4+ feet to the height !  

 

“There is nothing in the current agreement offered by the County to prohibit a future increase in the height of, say, 8+ feet, even, to the TRB/Wall.

Is there ?

Nor for an increase in the width.

 

You cannot say at this point that in the future you will never increase the height beyond x feet, - for there is no way of knowing, now, whether x is a needed amount.

And it is unreasonable to ask Residents to be burdened with this uncertainty.

 

“This agreement simply applies to the currently specified TRB/Wall height and width.

Any future increase to the height or width is not included in this Easement but will be subject to a new Easement Agreement to be negotiated with residents.

 

In addition, the current Easement Agreement applies only to the constructing and maintenance of a TRB/Wall as specified. No other construction will be made.

 

Homeowner access to the water will never be denied and will be a Right in perpetuity.“

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 

 

The above needs to be included in the Easement.

 

The Temporary Easement will not affect my fence nor the ivy/honey-suckle on it.

Nor will the existing soil/composting-material be removed.

Construction on it will not last more than 4 consecutive weeks.

So as not to flatten the ice-plant unnecessarily then access to the Temporary Easement be via 2 distinct paths, only.

 

The number of months of Temporary Easement rental (for levee construction use).

 

The 2 large Agave cacti on the Temporary Easement will remain intact.

 

Where others may have TRB I will have MSD? ( one wall with sloping soil on the house side of the wall no more than 2.5? feet wide).

 

I was told that routine inspection of the levee would only be once every 2 years. 

 I would like to see something to that effect in any contract ( with maybe some emergency exception included if required)

 

Also in the contract would be a guarantee of 3 days notice before access to my part of the levee. (Notification would be fine by email.)

 

Also in any contract a guaranteed maximum number of street Access Points to the levee.

And a guarantee that those access points would be 6’ fenced, gated and locked.

 

And those access point locations be fixed and disclosed in writing, including permanent(if any) access points from resident’s property as well as those from the street.

( Future changes also need to be disclosed in writing).

 

A guarantee that if my part of the levee is indeed considerably higher than the lowest point on the entire levee system, then my wall have a height where all walls and TRBs have the same height throughout the whole levee system.

 

In the PERMANENT EASEMENT if my wall + sloping soil is no more than 3 feet wide, say, then the ice-plant may remain intact 1 foot beyond on either side ( for a total of only 5 feet of ice-plant removal)? ( or is it 2 feet for a total of 7?). And that you do not clear ALL the ice-plant for a total of 10 feet.

 

There’s a small cactus growing in or close to the PERMANENT EASEMENT. If you require its removal – I need to know – and be given good notice  -- so that I can relocate it.

 

Construction will be Sep 1st 2022 – Jan 14th 2023 ( or Nov 14th 2023 at the latest)